ROMTECH’s AutoCad Detailing Facility Routinely:

Defines the exact cage format by producing a working drawing using customer contract documents. This usually takes place a few days prior to delivery of the relevant cage type and enables all parties to progress forward from the original contract rebar drawing/schedule stage.

The drawing will cover the scheduled main and transverse reinforcing bars and cage dimensons but can also include lifting joints, skid spacer locations, debonding isofoam, sonic coring/inclinometer pipes and couplers. Where clamped cage formers are used, the drawing will state the recommended torque settings.

 

ROMTECH

• works with the customer to obtain Clients approval of the ROMTECH drawing

• issues the pile cage drawings along with any necessary component drawings to ROMTECH’s Works for cage manufacture

• issues the cage drawing for factory welded cages to site for inspection of delivered consignments, for ongoing reference and for submission to the

  Client

• offers a revision service for drawing updates

• maintains a long term database for completed drawings for use by customers and their Clients for the purpose of “as-built” records

• issues the cage drawing for site-assembled cages to site for the steelfixing and site inspection of completed cages

 

Detailing

 

Downloads

Cares Certification

Cares Certification

Aquatard

Aquatard

Rubber Bitumen Emulsion CLP

Rubber Bitumen Emulsion CLP

Insurance

Insurance